AWARD-READY · NATIONWIDE CAPTURE

Award-Ready.
The record your entry needs.

Awards are judged on what you can show. BuildReplay captures your site every day from fixed viewpoints, then compiles a curated evidence kit before your submission closes — in every state and territory, and for the national programmes.

See award pathways by state

We supply the evidence, not the result. Judges decide the outcome.

THE GAP

Strong projects lose on weak evidence

Category submissions ask for sequence, difficulty and craft. Three things usually break that story — and none of them are about the quality of the build.

01

The moment passed uncaptured

Slab poured at 6am, frame stood by Friday. If nobody was standing there with a phone, the work that wins categories was never recorded.

02

Recollection is not a record

Written submissions argue sequence and difficulty. Footage from a fixed viewpoint shows it — day after day, without a crew on site.

03

The deadline scramble

Entries close months after the work finishes. Rebuilding a timeline from scattered phone photos is where strong projects lose their story.

WHAT ARRIVES

The Award-Ready kit

Not a folder of raw footage handed over at the deadline. A curated set of evidence, built as the project runs and assembled around the categories you are entering.

Continuous period reels

Daily, weekly and monthly compilations assembled on the camera — the whole build in minutes, not a folder of files.

Milestone-tagged index

Slab pour, frame, roof, handover, fit-out — clips tagged to the moments judges ask about, searchable by date and camera.

Fixed-viewpoint sequences

The same angle across the project, so progress, methodology and site management read as a sequence rather than snapshots.

Evidence-grade integrity

Every clip is fingerprinted with a SHA-256 hash at ingest. A verified badge shows the file is unchanged since capture.

Curated submission kit

A shortlist of clips, stills and date-stamped captions mapped to your entry categories — assembled before the deadline, not after.

Formats that fit the entry

Shareable links for reviewers, downloadable files for upload portals, and overlays carrying project name and date range.

How capture verification works

AWARD PATHWAYS

Every state and territory, plus the national round

Capture works the same regardless of where the project sits. Pick a jurisdiction to see the programmes builders most often enter, and what each one tends to reward.

National programmes

Most national awards are entered through, or shortlisted from, the state round — one archive can serve both if the category rules allow it.

National Excellence in Building and Construction Awards

Master Builders Australia

Commercial, civil and residential contractor categories

Entries mid-year · national presentation November

Australian Housing Awards

Housing Industry Association

Residential design, construction and renovation

Entries late in the year · national presentation autumn

National Architecture Awards

Australian Institute of Architects

Design excellence across completed projects

Chapter entries first · national winners November

Professional Excellence in Building Awards

Australian Institute of Building

Building practice, project delivery and professionalism

Entries mid-year · presentation spring

Cycle data: 2025–26. 2025–26 cycle · confirm 2027 dates with the awarding body. Categories, entry windows and eligibility change year to year.

One project archive can support several entries — state chapter, national programme, and industry-body categories — subject to each awarding body’s rules on previously submitted work.

THE SERVICE

Four steps, run from your entry dates backwards

Award-Ready is a managed service. There is no portal to learn and no footage to trawl through — the capture runs, and the kit is assembled for you.

01

Map the entry

We start from your award targets: which programmes, which categories, which deadlines. The capture plan is built backwards from those dates.

02

Position the capture

Cameras are installed at fixed viewpoints that show the work — structure, detailing, sequencing, site presentation — not the site shed and the car park.

03

Capture through the build

On-device capture runs through the programme. Milestones get tagged as they happen, so nothing depends on someone remembering months later.

04

Compile before the deadline

Ahead of submission we assemble the evidence kit: the clips that carry the story, captioned and dated, ready for the entry and for the judging presentation.

COST CONTEXT

Camera hire plus the evidence service

Cameras are hired, not bought, and they keep working after the entry is submitted — for client reporting, defects and the next programme. The Award-Ready work itself is scoped once we know what you are entering.

Full capture pricing

Capture plan

From $145/month

Camera hardware, on-device capture, portal access and automated reels. Prices include GST.

Additional viewpoints

$75/month per camera

Multi-angle coverage for larger builds, with one-time provisioning quoted at set-up.

Award-Ready service

Scoped per project

Quoted once we have your award targets and deadlines. No add-on price is fixed before that review.

Prices shown include GST. Cameras are supplied under hire for the life of the capture plan.

2027 entries open before the build does

Capture has to be running while the work happens. Share the projects you expect to deliver next year and the programmes you are targeting, and we will map a capture plan backwards from those deadlines.

Ask a question first

No payment at enquiry. Mention the awards you are targeting in the notes field.

BuildReplay documents your project and prepares the evidence for your entry. Award outcomes are decided by each programme’s judges, and we make no claim on the result.